Do I Need a Permit?
Projects That Require a Permit
- Residential Construction
- New
- Additions
- Remodeling
- Commercial/ Industrial Construction
- New
- Additions
- Remodeling
- Accessory Structures: Garages, Sheds, Gazebos, etc.
- Erosion Control
- Residential
- Commercial
- Electrical
- New
- Alterations and Repairs
- including service upgrades
- appliance connections
- Plumbing
- New
- Alterations and Repairs
- To drain, waste, vent and supply
- Appliance connections
- HVAC
- New or Replacement
- Furnaces, boilers, A/C, unit heaters, RTU’s etc.
- Pools, Spas, Hot Tubs
- Any Moving or Demolition of Buildings
- Chicken Coops
- Decks, Stairs, Stoops, Porches (Attached and Detached)
- Reroofing, Residing & Trim, Window Replacement
- Renewable Energy Systems (solar, wind, geothermal, hydro)
- Signs
- Permanent, Temporary, Window, Banners, etc.
Please plan ahead. Due to the large volume of permits being issued, the amount of time to issue any permit may take up to seven (7) days.
